A new month - a new report from the construction site of the residential complex "Shchaslyvyi" (Lviv).
Builders performed the following works during the last time:
・concreting of the floor slab above the parking lot;
・pouring screed on 3-5 floors;
・drilling holes for gas risers in apartments;
・arrangement of the wet facade on the chimneys and roof (completed);
・production of blanks for laying gas pipes in apartments;
・arrangement of window drains;
・arrangement of a wet facade on cold transitions - gluing of mineral wool;
・laying of power electric cables from the transformer substation to switchboards of the 3rd building.
The following works are ongoing (or will be started in the near future):
・concreting of parking lot columns and installation of formwork under the floor slab above the parking lot;
・arrangement of screed on 1-2 floors;
・production of blanks for gas pipelines in apartments;
・arrangement of a wet facade on cold transitions - application of decorative plaster;
・arrangement of railings of balconies of cold passages;
・installation of entrance doors on cold passages;
・continuation of work on arranging external window ebbs;
・installation of ventilation grills on chimneys and roofs;
・continuation of the brickwork of cellars in the basement.
To see how construction is progressing and to choose one of the latest apartments, as well as a commercial space, a storage room or a parking space, book viewing with the sales department.