We are pleased to present an update from the construction site of the Shchaslyvyi residential complex in Lviv, located in Bihova Street.
The following works have been completed:
・insulation of the house basement and sanding of the car park and the house;
・tiling of the floor in the public usage places (floors 4, 5, 8, 9);
・applying decorative plaster to the walls of the public usage places (10-17 floors);
・installation of inspection hatches on water closets and low-voltage points;
・installation of a passenger elevator;
・installation of the Armstrong suspended ceiling frame (12-17 floors);
・installation of power supply cables for fire systems (fire panels, manual alarm button, ・・in-apartment smoke detectors).
The next planned stages of work include:
・waterproofing of the car park walls;
・installation of a thyroid membrane on the basement of the house, sanding around the house to the bottom of the landscaping pie;
・installation of gas meters, gas supply to the system;
・tiling the floors of the public usage places (4-9 floors);
・puttying of the walls in the public usage places (3-7 floors);
・applying decorative plaster to the walls of the public usage places (8-9 floors);
・installation of window sills in the stairwell;
・installation of power cables for fire systems in the building (6-13 floors);
・installation of doors to commercial premises on the 1st floor;
・installation of electrical networks inside the building;
・installation of the Armstrong ceiling subsystem (8-11 floors).
To see how the construction is going and choose one of the last apartments, as well as a commercial space, storage room or parking space, make an appointment with the sales department.