Herein we are informing you about the stage of construction of the residential complex “Shchaslyvyi” (Lviv) final phase.
During the past month, the builders performed the following works:
•pouring screed on floors 9-13;
•pouring vertical elements of the parking lot;
•welding the water pipeline of the house, laying pipes to the pump house;
•distribution of cold water and heating pipes in apartments;
•arrangement of a wet facade in the place where the crane was located;
•pasting funnels on the roof with mineral wool.
The following tasks are currently being performed:
•installation of horizontal formwork under the parking floor slab;
•pouring screed on the 8th floor;
•arrangement of the wet facade of funnels and elevators on the roof;
•laying of the internal gas pipeline of the house will start in the near future.